Monday, July 23, 2018

My African Adventure - Part 1

It’s been a bucket list dream of mine, since I started a bucket list three decades ago, to visit Africa. And this month, I was able to tick this once-in-a-lifetime opportunity off my list. And it was more than I could have ever expected.

Along with my daughter-in-law Kim and granddaughter Lauren, I joined a Harambe Humanitarian effort. There were fifteen of us who visited Kenya for 12 days (along with our American/Kenyan host couple and their 2 children). In that time, we accomplished two secondary school visits/programs for Days for Girls, visited a DFG center, visited two primary school to distribute composition books, pencils, erasers, and other school supplies, as well as distributing soccer balls (and pumps) and several hundred wooden toy cars. We took hundreds of pictures to share with the Kenyans. And our hearts were stolen along the way!

In addition to the work, we visited the Maasai Mara for two days of safari. We visited a Maasai manyatta village to learn how they lived, we met Maasai warriors in the bush and learned of their rituals and purpose, we were invited to a Maasai home for a delicious lunch, we shopped in the local marketplace and in a Kenyan grocery store and mall. We walked and motored the streets of Narok and woke to the sound of cowbells as local herds made their way to pasture. We visited an elephant orphanage, a giraffe sanctuary, and made lifetime friends with our teammates and local Kenyans. I didn’t spot a blue-shirted Obama, LOL, but our former President was there visiting his father’s homeland at the same time we were.

I’ve got so much to share, that I’m going to break down my trip into several picture-laden posts. I don’t know how many it will take, but I’ll just keep sharing until we get through it. I’m anticipating about 3-5 posts per week for two or more weeks.

Let’s start with our first day. We lost a day in the air flying from the USA to Amsterdam to Nairobi. We landed in Nairobi late at night on Monday the 9th, made it through Customs without incident, and then drove in three vans to our lodgings at the Royale Guest House in the Karen district of Nairobi. Karen is named for Karen Blixen - you may remember the book or movie Out of Africa. Most of this district is what was once her estate, and her home is still there although we did not see it.

These were the grounds of the guest house. We ate outside under the canopy. It was too cold to swim (mid-sixties, Fahrenheit), and anyway it was only a one-night stop. We were headed to the elephant orphanage and then the 3-hour drive to Narok where we’d stay for 4-5 days.


Guest houses and hotels here are not fancy. And yes, it looks like a bomb went off in this room, LOL, with our messes. We had mosquito netting for every bed in every stay. Plus we were taking anti-malarial drugs and spraying ourselves well. It was probably overkill for this time of year; I only got one mosquito bite the whole trip.


I enjoyed this unusual tile in an outside alcove off the breakfast terrace.


In the morning, I was awakened by the singing birds as dawn broke. I could hear the sound of distant drums, and I thought “How lovely - what a perfect way to be awakened!” Once I got up, however, I realized the drums were not of natives, LOL, but of someone in a nearby home or ?? playing the bass on their stereo too loud. I had to chuckle at that.


Here’s a photo of our group as we got ready to climb into the vans to take us to the Sheldrick Elephant Orphanage (with a fourth van carrying just our luggage!).


The David Sheldrick Wildlife Trust, takes care of many animals, but primarily elephants. We got to visit with their 18 resident elephants. Many of us adopted (fostered) elephants for ourselves or our grandkids - it’s a unique program that you can read about at the link I’ve given. I’ll talk more about this in another post, as we were able to go back there again a week later to visit our “children” (by appointment).

A school group (in front) and the public wait for the elephants
The orphanage is open for one hour per week for the public. The ellies are brought in in two groups; the under-2-year-olds and the 2-3-year-olds. After age 3, they begin their re-integration into the wild. They are with trainers 24/7 (even sleeping time), and the Trust makes sure they learn the ways of elephants and are accepted into herds before leaving them at about age 5.

As they emerge from their forest area, the elephants make their way to the trainers’ feeding ground in groups of 2-4 at a time.


They are fed formula from 3-liter bottles. Each of these small elephants (the first group of 8) get two bottles at this feeding. They drink a total of 24 bottles per day.

A trainer feeds the elephant
 “Hey wait! I want my bottle!”


After the bottles, the elephants get to much on succulent branches and leaves. The spectators are urged not to talk so that the playful elephants, who don’t know their strength, won’t mistake words and gestures for playtime!


The head trainer told us about each elephant and how he/she was orphaned. Many fall into wells or get stuck in mud. Still others are just found alone, and one was found with her trunk nearly severed in a poacher’s trap. They were able to re-attach the trunk, and she is doing great now.


The babies are then led back out to the forest by the trainers, and the whole process is repeated as the ten older (2-3 years old) elephants come in.



After that great visit, we hopped into the vans and rode about 3 hours through Nairobi, small villages and the Kenyan countryside on our way to Narok.

Between Nairobi and Narok is The Escarpment. It’s a ridge that forms the western wall of the Great Rift Valley. Fantastic views of the valley, but it was a bit overcast on this day.



The Great Rift Valley

The Great Rift Valley is a huge rift, bordered by escarpments. The rift runs most of the length of the continent of Africa. You can read more about it HERE.  A couple months ago there were significant rains and flooding in the area that opened up a crack in the earth in the valley. See the article HERE.


The Maasai tribe of Kenya (some live in Tanzania too) live in Narok County, of which the city of Narok is the county seat. The Maasai lands are divided roughly into the Mau Forest area (mountainous) and the Maasai Mara - the lowland savannah.  Maasai can be spelled with one or two ‘a’s in the first syllable.

After settling in our guest house in Narok, our headquarters for 5 nights, we visited a local shopping center for a late lunch and to stock up on bottled water from the grocery store.



I’ll have more to write about our Home Away From Home in Narok in the next post, as well as our first visit to a primary school and the accompanying festivities.



Saturday, July 7, 2018

Finish-Along Quarter 3 Goals

I’ll be in Africa when the linkup for the goal-setting post for the 3rd quarter Finish Along goes live. I’ve got my fingers crossed that I will find some access to wifi so that I can link up this post and participate.

For me, this quarter is going to be focused on finishing up so many projects that have been started over the last year or two. I really want to clear out my queue, or at least greatly whittle it down, so that I can focus on Christmas sewing and new projects come winter. Therefore, this list is ambitious.

1.  Let it Snow

This is a project I’ve had on and off on my lists for two years. I’m going to finish it this quarter! I’ve finally bought a cute hanger for quilty wallhangings in the living room. So now I have a place to hang it (when the time comes) and incentive to finish it.  This is a Heather Mulder Petersen pattern and the fabric is Kate Spain. I still love it, which is a good sign.


2.  Linked Squares
FINISHED AND BLOGGED ABOUT HERE.

This picture shows three pink blocks, but I’ve completed 18 out of 20 blocks in all colors. I just need to make 2 orange blocks when the RSC color of the month is orange and sew all the blocks together without sashing. The quilt will finish at 64x80 and probably become a donation quilt.


3.   All You Need is Love.

There is a lot to do on this quilt; more of the pictured blocks in dark blue, light green and orange. Then a black and white checkerboard row and then the 54 pink hears (already made), and a final round of some 8” block that I haven’t even selected. The quilt will eventually be for my daughter, but it's a long shot for this quarter.


4.   Orange Lozenges
FINISHED AND BLOGGED ABOUT HERE. 

I’ve been working on this project a bit recently and it’s farther along than this. I’d love to have it done for fall.


5.   Apron for myself.

I need a new apron badly, and with the summer and fall harvest, I’ll be spending more time than usual in the kitchen. So this is a priority for me.


6.  Aqua Donation Quilt
FINISHED AND BLOGGED ABOUT HERE.

I whipped up this cute little top last month with charm squares and some leftover neutral fabric. It just needs to be layered, quilted and bound.


7.  Bowties Quilt

The collage shows some of the bowties I’ve been working on, by color, for the last year. I think I have less than a dozen left to make, then I can begin assembly of the top. The colors will be mixed, but I haven’t decided yet on a setting.


8.  Groovy Guitars
FINISHED AND BLOGGED ABOUT HERE.

My husband Bruce has been so patient waiting for this quilt of his. I still have some hand sewing to do on it - stitching down those small yellow and green circles. Then I will need to quilt it; a simple stipple for the black areas, lines for the guitar necks (to mimic strings) and ??? for the guitar bodies. This is a high priority for this quarter. 

9.   Farm Girl
FINISHED AND BLOGGED ABOUT HERE.

Now that this has (finally) been stitched into a top, the rest will be easy. It needs to be layered, quilted, bound.


10. and 11.

These embroideries are with me on my trip to Africa. I plan to work on them during the looooong flights from Salt Lake City to Amsterdam to Nairobi and back again. I have no specific plans for them yet. 



12.  On Ringo Lake

I joined Bonnie Hunter’s annual quilt-along last December and made great progress until BAM! The steps came right on top of each other near the end, and I got behind. Then the Rainbow Scrap Challenge started up in January, and this has been tabled ever since. I’m not sure I’ll get to it this quarter. However, if I finish up lots of the other goals, this should at least move up on the list!!


And those are my goals for the third quarter of 2018. Fingers crossed that I can link up and make good progress!

Red Hot Sewing

It’s July, and that means a new color - RED - for the Rainbow Scrap Challenge. We’re sewing our red fabric scraps and linking up with Angela’s Scrappy Saturday post. Come join us!

Tomorrow I’ll be leaving for Kenya for 12 days on a trip that combines humanitarian projects (Days for Girls, ribbon cutting of a new community center, distributing hundreds of wooden toys from Tiny Tim’s Toys) and pleasure (3-day safari during the great animal migration). I’ll be taking lots of pictures, writing in my journal and getting to know as many lovely Kenyans as possible. I’m so excited that I can hardly sit still!

But sit still I did, earlier in the week, in order to churn out as much red scrap sewing as possible. Nervous energy! Here’s what emerged from under the needle....

One Linked Squares block. It’ll finish at 16”. Only two orange ones left to go...


Six 4.5” red bowties. I think I’ll only need a half dozen orange bowties, then I can begin assembly of this RSC quilt.


Lots of selvage squares: 12 at 6.5” and 2 at 4.5”.


Quarter log cabins galore. Sixteen of them at 6.5”.


All I have left to do are the Squared Away sampler blocks, which I plan to work on today since I’m all packed and ready to leave. And then when I get home in a couple weeks I’ll still have all the crumb blocks to work on.

Oh! I also sewed up six cute Christmas tree blocks for the Block Lotto’s July drawing. Coincidentally, they also feature red (with cream and gray or black). These were really fun! The link to the pattern is HERE.


Our garden is going gangbusters, and we have been enjoying the last of the rhubarb (now done), spinach and peas (both done), the butter lettuce (still going), lots of crookneck squash and the cherry tomatoes are just coming on.  I was able to get enough apricots from the tree to make two batches of apricot jam this week, and they are safely in the freezer.

The cats weren’t too crazy about all the fireworks for the 4th of July, but they did love the patriotic quilts I’ve had out. Here Darla models the one I made last year. I have one of Alfie snuggled in the quilt, too, but can’t find it at the moment. But Darla says the picture of her is better anyway.


See you in a couple weeks!

Sunday, July 1, 2018

July: One Monthly Goal

Welcome to July - the second half of the year already!! And even though I will be out of the country for almost half the month (going on a humanitarian trip to Kenya), I know I will still have time when I get back to knock out a quilt (she said, perhaps overconfidently....)

Last week I pieced together many of my Farm Girl Vintage blocks from Lori Holt’s 2015 quilt-along. I had been procrastinating on this one because my finished block sizes - it was one of my first major projects - varied by a half inch. But now that I’ve got a a few years and finishes under my belt, it was not nearly as bad as I thought it would be.  So here it is, a finished top. And the backing is already pieced (one long seam, it was easy) and waiting.


My goal for July is to get this quilt basted, quilted and bound.  

Since I’ll return on the 20th and probably spend Saturday the 21st sleeping and/or suffering from jet lag, I may not get started on it until the last week of the month, but it’s still very do-able. Unless I return home to a huge mess. DH is staying home to work, tend cats and the garden and “batch it” (play the bachelor) while I’m gone. Seriously, though, I’m only kidding about the mess. However, I do expect to return to a needy hubby, cats and lots of produce to put up!


Linking up to the July goal setting OMG linky party at Elm Street Quilts.

Saturday, June 30, 2018

Totaling Teal and Aqua and Turquoise....

Today is the last day of June, and time to recap our scrappy work on the aqua family of colors for the month.

The following collage shows most of what I got done for the Rainbow Scrap Challenge. For more colorful scrappy goodness, hop on over to Angela’s Scrappy Saturday blog linky party.


This month I completed:
4 Bowtie blocks
3 Linked Squares blocks
17 selvage squares @ 6.5”
6 selvage squares @ 4.5”
2 Squared Away blocks
13 Quarter Log Cabin blocks
2  “lollipop blocks” @ 6.5” (forgot the picture!)
7 crumb blocks
for a total of 54 blocks

By accident I included the mostly-aqua baby quilt top I made this month instead of the lollipop blocks.

Weight-wise, I gained instead of losing this month. I was up almost four pounds over two weeks, but have lost half of that already. I’ve been so busy that I was not being mindful of what I was stuffing in my mouth, nor have I had the time (or weather) to walk outside as much as I’d like. I finally had a DUH! moment - if we can use the mall for walking in the morning in the winter because outside is too cold, we can also use it in the summer when the weather is too hot. *facepalm*  But the temporary gain was a good wake-up call, and I’ve put the brakes on! No more snacking on popcorn all afternoon. There are so many great fruits and veggies available now. Back to walking - my clothes fit better. It’s hard keeping it all together (imagine me juggling lots of balls) as I prep for my Africa trip - just one week away! - but I can do it.

My last post, by the way, for those of you who just visit for the RSC linkup, showed my finished Farm Girl flimsy and the current garden shots. You can visit that HERE.

DGD Lauren
Today is my son Shane’s birthday but since he doesn’t read my blog (what self-respecting 30-something son would read his mom’s blog, right?), I’ll save the birthday wishes until we head out for dinner tonight at Red Lobster. The choice of restaurant has become sort of a tradition, because his daughter (my DGD London) always loves to look at the live lobsters in the tank, and then she and grandpa (Bruce) name them all.....


And in a few minutes I have a travel training online meeting to attend. We’re getting down to the wire. I’ve started gathering my packing. We got the last of the large suitcases this week but are still waiting on the Tiny Tim’s toys (wooden toys) that we will use to fill a couple of them. We (me, DIL Kim and DGD Lauren) are each allowed two 50-lb suitcases. The toys will fill 20 lb in each of ours. The rest of my suitcase(s) weight will be taken with flannel fabric for the Days for Girls operation in Narok, personal care items, Instax film (like polaroids), and puzzles. On the way home, we can fill them with souvenirs - African fabric and other items bough in the markets.  This cute picture is my DGD Lauren and some of the toys and bracelets she’s made from little colored rubber bands to take for the kids we meet in Kenya. Isn’t that awesome??

Have a great week!


Thursday, June 28, 2018

Just Call Me “Farm Girl”!!

Yehaw!  It’s been a hot and busy week here, and the theme around our little homestead (all .25 residential acres of it, LOL) has been farming.

Let’s start inside where the air conditioning belies the heat outdoors. I got a wild hair this week to pull out a well-aged UFO and stitch it up. Don’t ask me why - I guess I’m just sick of my UFOs nagging me.  These Farm Girl Vintage blocks date back to 2015 (I could’ve sworn it was longer....) when Lori Holt published her Farm Girl book. Anyway, I have way more blocks than would ever fit in a single quilt, so I picked my 30 favorites that were left (some I used in my Autumn Sampler quilt) and finally tackled this beast.


I call it a beast because I’ve been dreading putting it together. All I can say is that my piecing accuracy has greatly improved over 3 years. These blocks that were supposed to be 12.5” unfinished, actually ranged from 12” to 12 1/2”. I had to sew little strips on a couple to make up the difference that I couldn’t cover with the sashing. But I did it, and I can’t even say it’s even close to the worst quilt top I’ve ever pieced, LOL. Seriously, it measures 70x84” consistently. Whew, I dodged a bullet. It also helped that I decided to forgo cornerstones...

The backing is a cute farm-y print that I picked up from Connecting Threads for $2.76 per yard about 18 months ago. The five yards were the perfect amount that enabled me to sew a backing with just one vertical seam. Now, both the top and back will go onto hangers in my stitching room closet until next quarter.


Part 2 of this Farm Girl saga is a tour of our South Forty. That’s the south 40 square yards of our backyard, LOL. I may have mentioned that we’ve been feasting on spinach and lettuce over the last couple weeks. This week we’ve added peas and yellow crookneck squash to the mix. We could add apricots if there were more than 23 on the entire tree, LOL. No, I didn’t really count them....  But the birds are getting most of them because they are too high up for us to reach, even with the ladder.


I was hoping we’d get enough so that I could make one batch of apricot jam, but at this point we’d settle for each munching on one unblemished apricot that falls to the ground without bird pecks on it. Yeah, that one above looks nice, doesn’t it? But you ought to see the reverse side....


So, look at the growth! Those in the front left are tomatoes. The early girls are in the lead, naturally. They’re about the size of a small plum, but still green. That’s OK. I’m hoping they hold off until I get back from Kenya around the 21st of July. Maybe, maybe not.


The grape vines have covered the trellis nicely, giving us lovely deep shade on the patio. Of course, most of the time it’s too hot now to be out there between 11am - 7pm. But we do have the occasional cooler morning or evening, and we love to eat out on the patio when we can.


Here is a picture of the crookneck squash. There are three in the picture below, and they will be the next ones to be ready, probably in 2-4 days. We are having the very first one, already picked, with our chicken mole’ (the Mexican dish, not the varmint, LOL) for dinner tonight.


And here are the peas and the Tom Thumb butter lettuce. We get our seeds from Cottage Grove (Oregon) Seed Company, and they say this lettuce is their staff favorite. It withstands the heat well and is mild and delicious. For many vegetables (tomatoes, peppers, tomatillo, onions, potatoes), we use starts from local nurseries.


The spaghetti squash are already growing like.... squash. Since scale isn’t obvious in this picture, you’ll just have to believe me when I say this one is already about 7” long. Most of the other ones are smaller, which is good. I’m hoping that they too will hold off for 2-4 more weeks.


My newly-planted coneflowers are blooming. The picture below should be considered proof of Truth in Gardening. See those weeds all around the rock? They were not there when I pulled weeds on Monday, three days ago. I shudder to think of how many weeds I’m going to have to pull when I get home from vacation...


And here are the flower pots along the front walkway. Someone asked me (when the comments feature was broken) what Talavera was. These pots are Talavera - Mexican folk art. I love the bright colors patterns.  In the neighborhood, we are known as “the house with the colorful flower pots”.


And here’s a view that shows all the pots, the walkway, some newly spring-planted perennials to fill out some of the front beds, and the green (some) and parched (some) grass. Again, Truth in Gardening.


And speaking of parched, I’m going to go treat myself to a diet root beer float (a glass of Diet A&W root beer with a scoop of Halo vanilla ice “cream”). Two Weight Watchers smart points.....  I’ll see you back here on Saturday for my scrappy sewing June roundup.