Showing posts with label kitchen remodel. Show all posts
Showing posts with label kitchen remodel. Show all posts

Saturday, October 5, 2024

Autumn Leaves, Sewing String Blocks, Kitchen Remodel Before & After

It’s going to be a picture-heavy post. It was such a beautiful and busy week and we took lots of photos along the way, so let’s get started. 

This week I was able to sew about 32 string blocks from my brown scrap strips. The top pic is from last week, the bottom one was taken after the 32 blocks were sewn. I think there’s at least another 30 blocks’ worth in there to sew up, what do you think??


Here are the string blocks I finished, shown in piles of five with the foundation papers still on. The two on the right side are singles. 


The It’s a Jungle Out There quilt top is done and I’ve snapped a picture. But I had to hang it sideways on the design board to get it all in the frame. So it looks a little wonky on the right side because that’s really the part that was hanging below the design board before I turned the picture. 

I doubt if I’ll be able to start quilting it this week, but maybe I can get it pin basted. The backing is mostly sewn and ready. But I want to finish off those brown string blocks first and then figure out what other things I want to sew in October in the way of black and gray scraps. I’m linking up to Scrappy Saturday at Angela’s blog. 

***********************

So that’s it for my sewing for this week, folks! So if you’re not interested in the remodel pics or those of our mountain day trip, I won’t be offended if you take your leave at this point. 

BEFORE

Let’s look at some “Before” pictures first. We bought this condo, built in 1980, and moved in at the end of March of this year. It was very clean but very dated, with virtually everything original to the build. These before shots were taken on a whim just to have them, and I did no staging or picking up (obviously) first. And there was much still to unpack. 


Above you can see that the kitchen had a layout with a peninsula. Behind the peninsula (below) it was too small an area for more than one person to comfortably move without bumping into each other. The work area lighting was recessed fluorescents behind a now-yellowed plastic grid. 


The cabinets were dated, but well-made and solid, and were likely pricey in their day. Our remodel contractors all marveled at the quality construction of them. We did save one upper set (above the desk area in the last “before” picture below) and had them mounted in the garage for more storage. 

The corner cabinet above the appliance garage in the photo below (click to enlarge) had a spice cabinet built into the door. The larger knob on the bottom right opened the entire door to the corner storage area behind, but the little knob on the bottom left of the front panel opened to reveal spice racks built into the door itself. I hated to see that go - it was so cute and clever. 


There was no lighting over the sink or the area beyond the peninsula that functioned as the eating area. It was so odd! 


Standing in kitchen vinyl floor area, you look out into the dining or family room or gathering area. The entry hall is the area with the welcome sign on the wall over Bruce’s cool old upright radio. The carpet was a mess by the time the movers had unloaded (even with the runners they used). There was an electrical outlet in the middle of the floor (no longer to code), and this high traffic area carpet always looked dirty. We knew right off that its days were numbered!


Finally, you can see the inoperative trash compactor at the end of the peninsula below, taking up valuable storage space. The pantry, which you can barely see on the right side, we kept as is. It just got a fresh coat of paint with everything else. 



AFTER

Well, this first picture isn’t *quite* “after”, because the painting had yet to be done and the fan over the range hadn’t been installed. But you get the idea. 


In the pic below you can see the fan hood installed and the painting complete. I realized a couple days ago that we never got hardware for the pantry doors to match the cabinets. We will remedy that very soon! And we absolutely love the breakfast area under the microwave. The doors open to reveal a toaster, coffee grinder and all the necessities for breakfast-making. Everything is hidden just by closing the doors. And see how the coffee pot (which does fit in the cabinet but can’t be filled if stored there) is plugged in to the underside of the cabinet? There is an electrical strip behind all the under-counter lighting. 


Between the breakfast bar and around the corner (below), there are nine hidden electrical outlets! The backsplash tile is allowed to just shine. 

The window covering for the kitchen window (that has a deep plant ledge), is a duette roman-style shade.


I wanted some open shelving here for my cookie jars and other pottery, below. I’ve finally found some baskets on Amazon to fill the space under the countertop there to hide the clutter. It’s where I throw mail, coupons and other things. All I have to do now is order them!


Same area, different angle, looking out into the family room area. The room is bright, and the sun sometimes makes the sage wall appear greener than it is. Hopefully some of the other pictures will be more true. As you can see, there is nothing up yet on the accent wall. I’ll probably move our big round clock (currently in living room) there and add smaller framed pictures or art around it. 


One last picture of the island, showing the dishwasher and refrigerator along the outer wall.


We had plantation shutters installed in the other three windows of this area. 


Moving on to the (unfinished) family room/sitting area/ gathering place…..


Why yes, that’s Alfie, our tour guide showing up late, as usual. ;-). 

The standing lamp is just a placeholder until I find a more decorative floor lamp. And I need to add seasonally appropriate cushions and another side table, and, and…. But these things don’t happen overnight. It has potential…

The following three photos are not part of the remodel per se, but the entry did get a new plant shelf and light fixture. It will likely be painted in the same sage green as on the family room accent wall. 

The old radio faces the front door. As you enter, you You go left into the living room or right into the kitchen/dining area. The entry wall and hall got new light fixtures to match the kitchen’s pendant lighting. The entry landing is flagstone which I love, and it matches the fireplace which I don’t love. 


Bruce and I have spent some time scraping lichens off some of the fireplace stones. Lichens aren’t at all harmful, and some would argue they’re lovely and natural. But I wouldn’t be among those!  I’m considering giving the six black stones a color wash to tone them down and more closely blend their color with the other warmer-toned rocks. And when all the year-end seasonal decor is put away, I’ll be searching for a proper mantel clock! 


We are going to replace the (original) fireplace insert with a new one this fall. Which means I’d better get busy figuring that out so our feline overlords won’t miss their winter evenings in front of the fireplace!

So that’s it for the house pictures. As we begin working on other areas of the home next year (master bedroom and both bathrooms), I’ll bring you along. 

******************

There are years in the mountains of Utah that the colors rival that of New England. While this year was not one of those years, the trees were spectacular nevertheless. I’m just going to upload a few without much commentary of our day. I’ll be getting more pictures (of Bruce, Ruby and me) when Ruby’s daughter sends them. If there’s anything worth sharing, I’ll do it. But for now, here’s a sampling of some of the lovely sights we saw as we traveled around the canyons of the Salt Lake Valley and east to Park City. It’s Butch Cassidy and the Sundance Kid territory! 

Rock face at Timpanogos Cave area, Alpine, UT



Guardsman Pass, Heber Valley



Trailhead at Cascade Springs







Underground springs bubble up to the surface and form the headwaters of Cascade Springs, above. The springs feed into Deer Creek Reservoir and are some of the 82,000 miles of streams and rivers that that provide Utah’s drinking water. 


Coming down Big Cottonwood Canyon, almost ready to drop down into the Salt Lake Valley

Backlit aspen trees. Is there anything more beautiful?


This was our view as we sat in our camping chairs and feasted on sandwiches and fruit. It’s looking down on the Heber Valley.


I think that just about wraps it up from here. I hope you have a wonderful weekend!

Saturday, September 28, 2024

Finally - Some Sewing Time!

Oh my gosh, I have missed my time at the sewing machine! Not just a few random minutes here and there, but several hours of uninterrupted sewing, cutting, pressing, organizing scraps and planning. And it finally happened this week! It was so much fun; relaxing with music and no commitments over my head. I had two whole afternoons this week to sew, along with the usual sporadic bursts of time. 

First I sewed up all my green strings into 20 blocks of 6.5”, unfinished. I forgot to take a picture of them all laid out, but that’s OK. All through the year as I’ve been sewing string blocks, I’ve said I didn’t have plans yet for them. Finally, I just decided to once again - because I’ve done this in years past - safety pin them in batches of 15 for Quilts for Kids. They match them with fifteen other 6.5” fabric blocks, and put together kits with fabric for two borders. They’re actually fairly popular with some of our chapter members when they’re available. But I digress.

So, here they are with the other batches of 15 blocks per color that I matched up. I’ll donate them at our October QFK workshop. There are 120 blocks total, representing most of the string blocks made this year. Except the white/cream ones; they were left over from last year. For the other colors, I guess there weren’t enough to make a 15-block set.

Next I decided to organize my brown scraps. I cut lots of strips in 3” for a project I’m mulling over, as well as 2 ½” strips. I pulled out 2” strips for zipper blocks if they were long enough, but otherwise they went into my string pile. Take a look. The tomato pincushion is for scale.

Sewing brown string blocks will be my project for the coming week. That is, after I finish up the It’s a Jungle Out There top, which only needs two more seams.


The rest of the checkerboard blocks are sewn together and just need to be attached after another black horizontal strip. I just ran out of steam yesterday. But here they are, pinned up to the design board for this afternoon’s sewing session!


****************

Our neighbor Andy came over on Wednesday morning and painted our accent wall. It took us longer to tape it off than it did for him to paint it. It looks wonderful and is what I was aiming for. 

Anyway, the furniture is back in place and I’m on the hunt for wall things. I’ve pretty much decided to move in our big living room clock over the couch, but I still need a nice floor lamp and some plants. So the before and after pictures will wait until that’s done. Maybe I should stop sewing and start shopping, LOL. But I will show a couple little vignettes of the remodel.

Counter corner with charcuterie board and fruit bowl.


This dining area window with new shutters looks out onto the courtyard. The little table was gifted to me by my friend Maureen. One of the extra dining chairs resides here when not in use.

It was a relatively quiet week except for the wall painting and the housekeeper doing a deep post-remodel cleaning. Bruce even worked on the cabinet he’s assembling for the office nook in our bedroom and I cleaned and reorganized the garage of packing boxes and garden stuff. We’re getting ready for the coming cold months. 

I still have to get a plumber in here to move the stop-and-waste valve from the crawl space up to the main level. My car needs servicing this week, we have dentist appointments. But for fun, we’re taking a drive in the mountains (in a convertible!) to see the fall color and have a picnic with friends. Life is good!

Saturday, August 31, 2024

Ninety Percent

The kitchen is ninety percent finished! That’s a great number in a kitchen remodel when it includes running water! More about the remodel later in the post. But come to think of it, 90% a good number for our post-Covid recovery as well. We finally tested as negative a couple days ago, after two weeks of yuck. Bruce still has a lingering cough and I have a bit of congestion, and we are both working to build back our general stamina. But it’s good to feel good again!

Since I completed all my orange scrappy blocks for August in the Rainbow Scrap Challenge, I focused on sewing up some 16-patch blocks for the It’s a Jungle Out There quilt. But when I say “focused”, it was a pitiful showing, because it seems the universe conspired to keep me out of the sewing room for all but one afternoon this week. I was either still feeling yucky, or had an HOA budget meeting to attend (by phone as I was still contagious at that point), or the contractors were noisily doing their respective things. 

Anyway, here is the mess of blocks, pinned up on the design board. 


Rather than explain the layout I’m doing, I’ll show you a quick sketch of my plan. The panel with sashing and 48 blocks will make a quilt that’s approximately 60x76”, a good size for a lap quilt to be gifted.


Last week I had 20 blocks remaining to sew. This week I matched up fabrics and strip cut all the remaining pieces for those blocks. That took more time than the sewing!

But I did get four more blocks sewn and have four more in various stages. One good afternoon should see these finished! 

*********************

This week was the Big Week that really saw the kitchen come together. So on Monday morning, the cabinet guys were back to attach the final upper cabinets on top of the quartz countertop for the appliance station. 

In the afternoon on Monday, the tile guys came and set the tile for the backsplash. Then on Tuesday, they grouted and cleaned them and installed the window ledge. Note that there is uninterrupted tile; no outlets. I’ll explain that momentarily.

On Wednesday, the electricians were here all day to install the light switches, install the under-the-cabinet LED light strips and plug-ins, and hang the pendant lights. The electrical plug-in strips are mounted behind the lights under the cabinets. In the area around the sink and stove, there are actually nine outlets that you can’t see! When they were done, this is what it looked like.


Please excuse all the cleaning supplies and other junk in these pictures. Cleaning things during a remodel is a constant process. 

We also ordered three flush-mount lights in this same style as the pendants to use in the entryway and down our L-shaped hall. That was a last-minute addition, but we’re considering them an additional project, not part of the kitchen/dining remodel.  They’ll take a week or two to get here.

There are also three electrical outlets on the island; one on each side closer to the working end of the island, and one at the other (seating) end of the island to plug in vacuums and the like.


Thursday was a three-ring circus. The window coverings company came by at 9:30 to give us a bid for the plantation shutters for the three big dining area windows, and a shade for the smaller window over the kitchen sink. The electrician also arrived to install one LED light that he’d broken the day before. Then the plumber arrived and the window people left. So, the electrician and the plumber worked side by side. The electrician finished up and left. The plumber installed the dishwasher, the garbage disposal, and the faucet. But the faucet wouldn’t stop leaking, so we opted for a new one. So the plumber went to the plumbing supply place to get a faucet. He texted me three pix and I picked the one I liked, and he headed back. Meanwhile, Lowe’s came by with the new refrigerator and stove and hauled out the old ones. 

The appliance guys installed the refrigerator to the plumber’s awaiting lines. But they couldn’t install the stove because the 220v plug wasn’t finished. So…. The electrician had to come back (Friday morning) to do that. 

So here’s what it looked like at that point. 


Running water! That’s what I’ve missed most in the kitchen during this remodel. The fan and vent hood still needs to be attached. That and the painting and window coverings are the ten percent we’re waiting on. The painting and hood will happen next week. 


On Friday, the six dining chairs and the coffee table were delivered, and we ate dinner in the new kitchen for the first time. 


The refrigerator sticks out too fat in my opinion, but I guess we’ll have to live with that. I had no idea what a behemoth it was! They had to take the doors off to get it in the house. There is still ample room, though, to walk by.


So, that was my week. When the remodel is totally complete after the shutter installation, I’ll do a separate post with before-and-after photos of the kitchen and dining/family room area. 

Have a great week!