![]() |
| L-R: Bruce, Cathy, Annette, Kim |
![]() |
| Rolling Stone |
![]() |
| L-R: Bruce, Cathy, Annette, Kim |
![]() |
| Rolling Stone |
It was another busy week, especially in the sewing room. Besides sewing, we’ve been preparing to go on vacation to Arizona for the first time since just before COVID. And I had a lot of “budget and bills” work to do before we left, both on our stuff and my late brother’s. It will be nice when the sale of his house closes at the beginning of May. Supporting two households is getting old. And expensive!
This week I worked on my two Gameboard blocks (I really love these!) for Pink April in the Rainbow Scrap Challenge. I’ll be linking up to Scrappy Saturday, hopefully sometime Saturday morning (if I can sneak a minute before we hit the road to Arizona).
![]() |
| Lamium groundcover |
![]() |
| Brunnera |
![]() |
| Tulips |
I can’t wait to get out in the garden and get things planted! But I will wait until at least the second week of May, which is what everyone recommends for our locale and planting zone. I just don’t trust Mother Nature not to surprise us with a spring freeze!
My friend Ruby, who owns a longarm quilting machine, was able to quilt two (of 5) of my little kid quilts this week. And I, in turn, was able to trim, bind and label them. These are the first two finishes for April.
******************
I got my act together enough to finally share my progress on the Block of the Month (BOM) class I am taking (after much coercion from Ruby). There are several of our friends and family taking the class, so it’s rather fun. But don’t tell Ruby I said that!
I’m pretty happy with all my blocks, except for one. I hated the block and had no intention of buying the requisite ruler for it, knowing I would never again voluntarily make the block. But let’s start at the beginning.
The BOM started in September and will run through August. You pay $5.00 when you start the class and provide your own background fabric (fabric A). The store provides cuts of Fabric B and Fabric C. If you finish your block and bring it to the next month’s class, you don’t have to pay for the next month’s B and C fabrics. If you don’t finish the block or attend class, you pay another $5.00 for the next block. I’ve finished every one so far.
![]() |
| September block |
![]() |
| October block |
![]() |
| November block |
This next one, the December Block, is absolutely hideous. I hate the pattern and the colors they gave us (after that block, I have been changing out some of the batiks to keep them brighter). But in the interest of transparency, I’m showing the block. I know I’m merely an average quilter, and I’m just fine with that. But this block is cringe-worthy even for a beginner. (SO why, I wonder, would the instructor put this as block #4 in a “beginner” class?) I did not have the right ruler or the inclination to make a real effort on this block, and it shows. Please don’t judge! It will definitely be replaced with prettier colors and a pattern I like better. And can sew better, LOL!!
![]() |
| December block |
![]() |
| January Block |
![]() |
| February Block |
![]() |
| March Block |
![]() |
| First Seven Blocks |
Hi there friends! Why don’t you grab a cup of your favorite beverage and have a seat. We’ve got a lot of Stuff to get through today! This will be a picture-heavy post, at least by my usual standards.
Last Saturday, we (Ruby, Kim and I) attended the World Wide Quilting Day event in Sandy, Utah. Joining us were Cathy (Ruby’s sister) and Jenny, Cousin Kim’s niece (and my late Cousin Carrie’s daughter). We had a blast. After we got settled into our favorite spot (by a window and an electrical outlet) and got our machines set up, we wandered over to the stage area. There, boxes and boxes of donated fabrics and scraps and books and patterns and….anything quilt/sewing related were spread out along with tons of quilters (both figuratively and literally) were searching for treasures.
I’ll finish up the border on this and then hang it with the others to be quilted. I’m hoping that Angela at So Scrappy will announce April’s color of the month today so that I can get started on it this weekend. Update: she did! April’s color is PINK,
This morning is our Block of the Month class. Once that is done, my goal today is to finish the garden clean-up in the courtyard before the rains begin for all next week. Also, we (Bruce Kim and I) will be taking off for Arizona to visit family next Saturday. I’ll have a post up Friday night, but not sure when or if I’ll be able to link it up to the RSC as we’re driving for a couple days. But driving will probably be easier and faster than attempting to fly these days. Enough said.
Have a great week!
One of the things that my Cousin Kim, me, my friend Ruby and her sister Cathy do every year is attend the Worldwide Quilting Day event in the city of Sandy, which is at the South end of the Salt Lake Valley. We’ve spent a good part of the week in preparation, gathering up the projects we want to work on, gathering up finished quilts to turn in to our Quilts for Kids group who will also be there, gathering our donations for the giveaway tables (which take up an entire performing stage area), preparing our food donation (it’s a gigantic potluck), etc. The event starts at 10:00 on Saturday morning (tomorrow as I write this but probably today as you read it). I’m sure I’ll be too excited to sleep well tonight!
But let’s get “business” out of the way first, since I won’t be able to share pictures of the event until next week. I sewed this week on some red blocks for Red March in the Rainbow Scrap Challenge.
I still have my red strings and crumbs to tackle next week, so there will be more red sewing. But for this week, I belatedly decided I ought to work on my scrap challenge quilt. Every year at WW Quilting Day, they make up gallon-sized baggies of scrap “kits”. They are numbered, and you can check one out if you’d like to make it into a quilt, supplementing it with your own scraps. Well, I forgot about it last year until just as we were leaving. So I ran back to the table where these were and all that were left were three very dark and ugly bags of scraps. I selected one that had some bright bits in it, and checked it out.
Fast forward to this week - *ahem* I’m usually not a procrastinator, but the fabrics were so dark and ugly that I couldn’t justify spending time on it. There were 43 little wonky square-in-a-square blocks (about 2-3” each, I never actually measured). The center was a small bright print surrounded by ugly blues and grays. But there was a piece of a solid bright blue nestled in the bag that gave me an idea. So I pulled out some solid brights and set out adding another round of triangles to the wonky blocks to brighten them up.
So the above picture shows what I had by Wednesday morning. But Ruby and I spent Wednesday at Cathy’s house, longarm quilting the wedding quilt for my grandson’s that I’ve been working on. I’ll show that hopefully next week. It’s quilted and trimmed and I just need to bind it, then I’ll need a quilt holder and locale for its glamour shots. But I digress.
Anyway, the bright triangles brought the block sizes up to 5” (4.5” sewn). Set at 6x7, the quilt was still small. So I added a purple stop border and searched my stash for another border and backing fabric. I struck gold! Well, metaphorically anyway, because the border fabric was perfect!
So that brings my total quilt finishes this year up to three so far, all done this month. And when I get the binding on the wedding quilt, which will be done this month, that will be four finishes! I think my slump is over!
This was a busy week. We got our taxes done (yay!) and our accountant will be handling both my brother’s 2025 tax return and the estate tax return (after the closing on the sale of his house). He explained the process, and I’m so relieved that I’m in the hands of a great trust accountant, a good attorney and a good real estate agent. I see the light at the end of the tunnel, and it’s not an oncoming train!
We are also planning our trip to Arizona in April, so that will be nice. But no sewing for 10 days, so I’ll be playing catch-up again in April. Then there is also my grandson’s wedding (another 2-day trip to northern Utah), and the court hearing (by phone) to be named as Personal Representative of my brother’s estate. All in April. Also, my left knee is going downhill fast, and I don’t think I’ll be able to wait until September to get that knee replaced. I’m thinking now that it’ll be some time in late June. That will mean I can heal in plenty time to enjoy the swimming pool this summer!
Life is good.
Nothing like a little over-dramatization, eh? Actually, my red scrap bin is just right - full but not overflowing, and yielding some yummy scraps and chunks to work with this month. March in the international group Rainbow Scrap Challenge is dedicated to sewing up our red scraps. Every month for the first 10 months of the year, our hostess Angela calls a new color for us to focus on. We make blocks (our choice) and share with the other participants. The last two months are spent either sewing our resulting blocks into quilts, catching up with a color or two that needs more work, or just laying low for the holidays. Personally, I enjoy lots of manic sewing during that time to get things “off my plate” for the following year.
So let me first show you two quilt finishes that happened this week. My friend Ruby has a longarm quilting machine, and she volunteered to quilt these two little quilts for me so that I could get them bound in time for the World Wide Quilting Day event we’ll be attending next Saturday. Our Quilts for Kids group will be there, and I wanted to get these turned in.
First up is Night-Flying Geese. This was a Rainbow Scrap project for me last year, inspired by my friend Cathy at Sane, Crazy, Crumby Quilting. It measures 41x52”.
In all seriousness, I guess every quilt isn’t a looker, and I’d rather sew up the scraps than see them in a landfill. It measures 40.5x46.5”.
I finished sewing the wedding quilt blocks into a flimsy. No pictures, though, because I need to press the bajillion seams and trim threads on the back. Then I’ll sew up a backing so that I can turn it over to Ruby when she’s over on Sunday. She’ll be quilting it, and wants me to come over to pick out the thread and quilting pattern this coming week. I hope she doesn’t think I want to start learning how to operate the longarm, because that is DEFINITELY not going to happen. On a scale of 1-10, my interest level for longarming is at -2.
I also dove into my red scraps (see the title of this post). I had already cut out most of my blocks, and indeed I have sewn most of them, but this week I’m sharing my Gameboard blocks and my Switchplate blocks.
Here are the four Gameboard blocks, which will finish at 8”.
They are really fun to make, but very easy to mis-orient. Ask me how I know. Next, were the Switchplate blocks, also inspired by unabashedly copied from friend Cathy referenced earlier in the post.
This is the second year I’m making these. The blocks are small, finishing at 3x5”, so it takes a lot to make even a kid-sized quilt. I may be hating life when I have to sew them all together, but I’ll remind myself that it’s a good way to use up 1.5” strips of fabric.
*******************
I want to thank everyone for their lovely comments last week. After being gone for a month, it was so heartwarming to read your comments. I genuinely appreciate it. I believe I’m back on the right track now after one hellacious winter! Life feels a bit easier these days. Yes, spring is on the verge of popping, but it’s more than that. I no longer feel as though I’m slogging through water as I go about my days. The mental fog has lifted, the Must-Do’s are waning and I’ve been able to actually step back into my mostly-organized routines. I’ve been making plans for the spring and even out into the mid and later parts of the year.
In early April, we’ll be taking a trip to southern Arizona to visit Bruce’s three remaining siblings. We are looking forward to it. Cousin Kim is also coming (her mom was Bruce’s oldest sister Faye, who died in 2005) and she and I will split the driving. We will take 2 days to get down there, stay a week with the family, and take two days driving home. We haven’t been there since February, 2020, just before the Covid shutdown. Bruce’s siblings haven’t seen him since his arm amputation. Since 2020, we have lost Carrie (Kim’s sister), Doug (Bruce’s younger brother) and our brother-in-law Glenn, husband of Bruce’s sister Annette. Our numbers are dwindling, and we all feel it’s important to gather while we can.
In late April, my daughter Megan is flying out here from Seattle to attend my grandson Easton’s wedding (her nephew). We’ll all drive up to the Logan, Utah area (northern Utah) and stay in hotels so that we can enjoy all the festivities and not have to make the 2+ hour drive up and back in the same day. And that reminds me that I’d better go dress shopping this month!
Also in late April/early May will be the court date (by phone) to finalize my appointment as my late brother’s Personal Representative. The closing on the sale of his house will then follow the next week and I’ll be able to sign all the vehicle titles over to their new owners. Life will be so much easier not paying all Steve’s bills in addition to ours! There are still taxes and things to fret about, but we’ve got a great accountant and he’s already on the job.
But today is for fun. I’ve set the agenda for the day, since it’s my birthday. First we’re going to our favorite garden center, where we’ll special order in some shrubs and flats of flowers. We’ll also talk to them about the design and sprinkler services they offer so that I can hopefully get our courtyard garden all properly set up with accessible valves and sprinkling systems (more drip irrigation instead of sprinklers). Then we plan to enjoy the weather outside, even if it’s just sitting in the courtyard sunshine and reading. And finally, dinner at our favorite Mexican restaurant.
Life is good.
I know I’ve been gone from the blog for awhile, like a month. One week I was in Colorado, attending to my brother’s estate. The second week I had no sewing to report and no time to report that I had nothing to report. The third week was just general malaise. I’ll stop short of saying “depression”, but it was a feeling of being overwhelmed and having so many things beyond my control. You’d think that at this stage of life (old, pre-historic) I’d be an old hand at daunting circumstances. You’d be wrong!
But things are looking up on several fronts. Spring is so close, I can almost taste it! At least I think I can - when it stops raining and snowing and the sun comes out.
I’ve had an offer, which I’ve accepted, on the sale of my late brother’s house. The probate docs have been filed and we should be through all the legal stuff in plenty time to complete the rest of the stuff - closing on the house, passing titles on the vehicles (two out of three of which have been problematic). Stuff. I’d really like to call it what it is, so here goes. . . it’s all “bullstuff”, if you catch my drift. But at least that means there is an end in sight to the maintaining of two households this spring. Still have to get through tax season, a mammogram, and an eye appointment. But at least I’ve found a new primary care physician, even if I can’t get in to see her until June.
This past week I’ve really had a lot of time to sew. I only had to dedicate one day to legal/realestate/ tax/insurance and utility issues for my brother. After that, I turned my attention to sewing (and family and friends too). I’m beginning to emerge from my protective winter cocoon.
I finished the last 15 of the 30 blocks (that finish at 16”) for my grandson’s wedding quilt. I’ll do a post next week on that. For now, I’m sewing them together into a flimsy so I can get it to Ruby to quilt in the last half of March.
After the wedding quilt blocks, the next priority was to get caught up on my blocks for green February in the Rainbow Scrap Challenge.
![]() |
| 3 Gameboard blocks, 1 Rolling Stone block, 2 Switchplate blocks, 45 string blocks |
Once I was caught up with dark and bright green (I’ll save the pastels for another month), I tackled my red scrap bin. Red is the RSC color that Angela chose for March. While nothing is sewn yet, I do have all my planned blocks cut out and ready to stitch.
![]() |
| Top: 7 Hollow 9’s, Middle left: Switchplates, Middle right: 4 Gameboards, Bottom: 2 Rolling Stones |