I completed three quilts, all of which were near the final stages at the beginning of the month. They just needed basting, quilting and binding. More information about them is in the Quilt Gallery tab, above. They are Groovy Guitars for Bruce, an aqua donation quilt and the Farm Girl quilt for me. So glad to have these all done!
But this past week I just focused on moving other projects along. I basted Linked Squares.
I started another quick quilt (gulp). It’s just going to be a quick patchwork baby quilt for our friends Marilyn and OD from Kenya, who are visiting here in September. It will be a simple patchwork quilt. The patches are already cut. The zebra fabric on the left below is the backing (with a stripe of the blue) and the blue will be the binding. It’s for their son S. This fabric is from an older line called Origami Oasis by my favorite designer, Tamara Kate.
I made progress on Orange Lozenges by sewing up an additional five blocks - each block containing 24 lozenges. The last row that’s pinned to the design board is overlapped by the row above it due to space considerations - my design board isn’t long enough.
So, I only have four more blocks to finish, and one of them is almost done.
The other three are ready for their corners. It was a challenge to make sure that there were no more than two of any one print in any block, so I was sorting and re-sorting until the end.
This WILL become at least a finished top in September, although I want to finish the entire quilt. In fact, I’m declaring that as my OMG - One Monthly Goal - for September as I link up to Elm Street Quilt’s September Goal Link-up, HERE
.
Moving along, I also began sewing together my Bow Ties into a quilt. These little blocks are 4” (finished), and there are 288 of them that will be set 16 x 18, resulting in a quilt that will measure 64x72”. I got half of the quilt done! I have so enjoyed this Rainbow Scrap Challenge project over the last two years and really look forward to seeing this one completed.
I finally settled on this very basic, traditional set with random color placement. It’s going to be a keeper for me. There are just so many memories stitched into it from all the fabrics! I would love to finish this top in September, too, but September promises to be a hectic month (more on that later), so we’ll just have to see.
Here are some close-ups.
Alfie and Darla won the voting for the 2018 Pets On Quilts category Cats on Quilts over at Lily Pad Quilting. YAY! Thanks to all of you who took the time to go over to see the contest (it’s for a good cause) and vote. They won a jelly roll of fabric, which they gave to me. And some of YOU won prizes, too, for participation. Way to go!
And now we start on dark blues for the Rainbow Scrap Challenge. I’m happy we’re finally getting back to the blues. I have lots more birds to make in blue this month, plus all the rest of the blue Irish Chain blocks for the top. And we have another block for our Squared Away quilt, so there is certainly a lot on my plate for September.
And speaking of a lot on my plate, my brother Steve will be returning to visit us in the coming week. He found a cute house in Montrose County, Colorado (southeast area, about an hour from Grand Junction) with about 3/4 acre of land, and bought it. He closed on it a couple weeks ago and is now ready to return here to gather his stuff and haul it home.
Steve will return here by train so that he can rent and drive a U-Haul truck and trailer (to tow his 1930 Model A Ford) home. While he’s here for about a week, he also has all sorts of business - banking, medical, etc - to wrap up. Since I’ll need to chauffeur him around, I imagine it will seriously cut down my sewing time for a week or so. LOL. But the upside is seeing him, to say nothing about getting our storage areas and guest bedroom back. So it’s all good, right?

















































