Saturday, February 25, 2023
Snowmageddon
Saturday, February 18, 2023
More Quilt Finishes and the Rest of the Fabric Tour
Usually when Blogger goes berserk on me, it at least lets me know that there are unsaved changes to a post. But last week? No...... So the last part of my studio fabric storage “tour” flew off into the ether, never to be seen again. (Like a Chinese spy balloon?)
So let’s quickly dispatch with that and then move on to this week’s Rainbow Scrap (pink!) progress and the quilt finishes for the week.
These are the bottom two shelves of the leftmost (of three) bookshelves. The upper shelf holds two WIP quilts (another Zip quilt to be sewn - FOR ME THIS TIME! LOL) and the Red Ribbons quilt that needs to be finished. The rest are fabric pulls for three more personal quilts and several pillowcases, also personal.
Saturday, February 11, 2023
Three Finishes and Studio Tour
This week, three little quilts “got their wings” (were officially finished) - and none of them are pink. Two are little blue quilts from January and one is an RSC finish of blocks from last year. I will be getting to some pink quilt tops and some Community Quilts once I spend this afternoon pin/spray basting them. I’m hoping to get five finished next week, but if I could only get three done this week (did I really just say “only” out loud?) then I’m not going to hold my breath for five finishes next week. Whatever happens, happens.
Let’s see which little quilts got their wings.
First up is this cute little Bow Ties quilt. These were some blocks I did for last year’s Rainbow Scrap Challenge.
It measures 42x48} and was quilted with a simple stipple. The backing is a piece sent to me by Jo Kramer for her Community Quilts donation quilt program,.
It finished at 42x48”, was quilted with loops, and used up most of the rest of this blue print for the backing. The remaining bits will be cut up for Zipper blocks.
Saturday, February 4, 2023
Pink February
Saturday, January 28, 2023
Back in the Saddle
Now that I’ve completed my New Owner classes for my new sewing machine “Nina”, a Bernina 570QE (Quilters Edition), I feel as though the machine and I are working well together and I’m back up to speed. I was frustrated because I didn’t have a walking foot that came with this machine. About mid-week I finally remembered that when I traded in my old machine, they had me keep my walking foot and all its accessories. Hmmmm…. Where did I put that????
After a little straightening of the messy sewing area behind my sewing seat, I found my walking foot! But that was already after I had sewn the binding on my second Zipper quilt (pictures coming below) with the quarter-inch foot using dual feed and sewn the binding on the second quilt with a zipper foot. Hey, that actually worked great!
But now I’ve got my beloved walking foot back, and everything is right as rain!
First up this week is the Zipper Quilt. This is my second one of these (can’t get enough of these blocks). It’s Lynn Dykstra’s Zip Block, and all credit goes to her. It finished at 52.5x61.5, a good-sized personal lap quilt. It’s going into my personal giveaway pile.
Zipper Quilt #3 is all cut out and will be started later this spring. I just love the riot of color, and find the Zip Block to be a great use of 2” scraps.
The next finish was this 9-block quilt made of donated quilt blocks. Well, I made one (the Dutchman’s Puzzle block in the top center) to round out the number needed for this quilt. Next week I’ll show the 12-block quilt made with the rest of these blocks.
The majority of this week’s sewing time was spent planning and executing the following quilt top from my dark and bright blue scraps. That’s the January color for the Rainbow Scrap Challenge. There was obviously some assistance from the dark green scrap bin as well as 10 blocks from the block orphanage.
My friend Ruby gets back from Egypt and Jordan today, but she’ll most likely spend Sunday sleeping instead of sewing with us. I don’t expect to see her until Tuesday at WW.
That’s about it from my corner of the world. See you next week!
Saturday, January 21, 2023
Blue Blocks and Quilt Kits
The weekend sure sneaked up on me today! (I like the sound of “snuck” better than “sneaked”, but it’s not correct according to Google). Wasn’t it just Saturday, like, yesterday? OK, maybe it was a few days ago, but jeez…. So, here we go.
First I framed 8 of the wild animal squares with blue, turning them into 10” blocks. It will take 20 to make a single quilt, and I have enough of the print pieces for 2 quilts. But I’ll be using other colors, like green and yellow and maybe more red or orange to frame them as those colors are called during the year for the Rainbow Scrap Challenge.
Additionally, I sewed up some 4” crumb blocks, but I’ll show those next week when they’re sewn into the “candy” blocks.
Since I spent the better part of two days this week cutting and assembling five Zipper Quilt kits for the Salt Lake Chapter of Quilts for Kids, I have to show those as well.
As I’ve mentioned before, each of these kits uses up 3.5 yards of fabric, so these represent a stash reduction of 17.5 yards. Wahoo! Some of the backing fabric was purchased by me, but most of it this time around came from generous donors. Thank you!
And, in preparation for a mini quilting frenzy next week, I basted three quilts this week. Technically, the zipper quilt in the middle was basted before, but when my back-up machine Bob went berserk while quilting it, I had to unpick that quilting, remove the pins and start all over.
So, after my final New Owner class today, Nina (my new machine’s new name. Thanks, Astrid!) and I will begin our quilting journey together!
*********************************
The following story is unrelated to quilting, so you can skip this if you want….
Last Monday we and a few of our neighbors had a nice meeting at a local Starbucks with the demolition contractor who is handling the clearing of the large site behind our street. About a month ago, as a storm front was moving in and it was rainy and very windy, some corrugated sheet metal panels came partially loose from the back wall of the furniture store they were tearing down. The panels were flapping in the wind, threatening to (1) blow into either our house and our neighbor’s house, or (2) fly into the electrical lines between our homes and the wall. The demolition crew were Johnny-on-the-spot and rushed their excavators over to hold the panels securely with the claws at the end of the long articulated arms. Four of them, lined up along the wall like metal ballerinas. But it was only a temporary fix, and they decided to knock down the wall instead.
Now, there were three remaining walls that were still standing throughout this multi acre site. They were all outside walls of various buildings, and all composed of cinder blocks filled with pelleted polystyrene insulation - styrofoam bits. The plan was to knock each wall down in its entirety all at once, preventing the pellets from spreading. So, with the above metal panels threatening to take flight, they decided to knock that wall down. Well, the wall broke halfway down instead of fully collapsing. The flying metal threat was eliminated, but polystyrene pellets rained down on our houses and neighborhood thanks again to the wind. It looked like tiny hail, or cherry blossoms. Mayday! They called in the Murray City experts and the health department, who ran tests to verify that it was non-toxic. And then the clean-up began. The City brought in street sweeping vehicles and the demolition company had people shoveling areas of accumulation. It was still rainy and cold. Later that evening, a crew came around and shop-vac’ed our driveways and front walkways.
There are still lots of the pellets remaining, and the meeting I mentioned above was to let us know that as soon as weather permits, they’ve hired a landscaper to come and remove all the pellets from our yards. They’ll suck it all up with a shop vac, replace soil where necessary, and de-thatch the grass areas. It was nice to meet the demo company owners. They had gone around the neighborhood to collect our names, addresses, phone numbers and email addresses, and have kept us informed every step of the way. The meeting was primarily for everyone to meet and be reassured that they will do everything possible to “make us whole”. They seem to be a very honest, hard-working and reputable company, and we know we’re in good hands!
Oh, and in the interim, the remaining walls have come down - wow! Like an earthquake!! But that’s OK - at least there were no more styrofoam pellets!


















































